top of page

Didim Wastewater Treatment Plant Deep Sea Discharge Line Maintenance and Repair Work
Repair, maintenance and maintenance works were carried out for the broken and damaged pipe in the Didim wastewater deep sea discharge belonging to the General Directorate of Aydın Water and Sewerage Administration. In order to prevent the discharge of the pipeline, which broke at three points, to the shore,
- Replacing the broken pipe with a new pipe,
- Placement of protection saddles,
- Work has been carried out to clean the pipeline route.


bottom of page