top of page

Control of Dam Structures

  • Clearly revealing the economic life of the dam by determining the dead, active and total reservoir volume with very high resolution.

  • Taking precautions against the risk of active volume being much less than anticipated

  • Determination of sediment deposition areas and deposition rates through periodic studies

  • Determining the amount of past sedimentation, predicting the situation for the short, medium and long term, and determining the measures to be taken to extend the dam life accordingly.

  • Determining the areas where pollutants are concentrated by sampling and analyzing sediment and water, thus preventing transportation and accumulation that will cause water pollution.

  • Integration of the obtained data into Geographic Information Systems, creation of a database and analysis of spatial and temporal changes.

bottom of page